Wilkinson DC2

The Newport centre DC2 is a live distribution centre and the aim of the project was to upgrade the 1,000,000 m2 shed to improve safety and efficiency.

The centre was fully operational throughout our programme which resulted in logistical, safety and pollution challenges to face to ensure the effective delivery of the project.

The project consisted the removal of all internal elements of the building e.g. racking, lift shafts, concrete, conveyors and mechanical systems.

We used a variety of methods such as mechanical demolition, hand dismantling, burning whilst minimising the contract sum by salvaging elements during the 8 phases.

Location: Newport

Project Value: £1.5M