Skip to main content

LSG – Chosen for Care: Trusted for Expertise

Bridgewater

Substation design and build including transformer, CSE, PASS, switch room bases, and 9m high blast walls on this capital funded project.

Chandos Road Substation

The construction of transformer, CSE, PASS, switch house bases, 9m high blast walls, 11m high precast columns and architectural brickwork and associated fencing, gates, and site roads.

Mollins Substation

The construction of transformer, CSE, PASS, control rooms base, switch house bases, 9m high blast walls,
5m high retaining walls and associated fencing, gates, and site roads.

River Leam

The construction of large concrete UTX and UTP chambers as part of HS2 diversion works

Lovelace

Design and Build foundations utilising screw piles

Broadway

RC package with basement and 5 floors in Wimbledon

Westminster Abbey

Westminster Abbey by LSG

Construction of 4 storey RC liftshaft for the triforium visitors centre above Westminster Abbey.